Call 1-877-499-9500

Contractor Services

 
Contractor Services
  • Affiliate Program

    We are introducing the Assurance Power Systems Generator Affiliate Program.  This new program will bring
    to you a nationally recognized generator installation, service, and support staff allowing you to profit without all the headaches of the installation and service.  We are state licensed electric, gas, and general contractors

     As you may or may not have experienced first-hand, generator installations are multi-trade projects involving detailed permit drawings, multiple permit applications including gas, structural, and electrical, and can span multiple months.  Our new Generator Affiliate Program takes the hassle out of the job and PUTS THE PROFIT IN YOUR POCKET!

     Be Backed by the Best - Benefits of the Program:

    • Dedicated engineering staff for all permit drawings and systems engineering
    • In house gas department to handle all of your gas needs - LP Tanks & Natural Gas Hookups
    • Dedicated startup and service technicians
    • Contractor pricing - 20% under list price
    • Complete the electrical installation or just take a 2.5% commission for referring the job
    • Sales & System Design training

    Commission Schedule:

    • Up to $100 for every Preventative Maintenance Agreement
    • 2.5% commission for a complete installation job

     

    Assurance Power Systems Qualifications & Highlights:

    More than 1000 Generator Installations

    Assurance Power Systems has installed and commissioned over 1000 standby generator systems in South Florida.  APS manages the jobs from start to finish and doesn’t stop until the customer is 100% satisfied.

    More than 2000 Service Customers & Annual Service Plans

    Assurance Power Systems has one of the largest generator customer bases in South Florida.  APS offers several levels of Preventative Maintenance Plans and we are a certified warranty service dealer for most major generator manufacturing including Guardian, Generac, Briggs & Stratton, Kohler, Onan and Katolight.

    Lowe’s Installer for Palm Beach, Broward & Dade County

    Assurance Power Systems is an authorized Lowe’s installer for Palm Beach, Broward and Dade County.  Assurance Power Systems was nominated for this role by Generac Power Systems.

    The Builder’s Choice

    Assurance Power Systems works with more contractors and home builders in South Florida than any other generator company.  Our reputation is flawless and our dedicated project managers ensure jobs stay on schedule.

    Generac National Generator Council

    Will Ferrigno, President, has been nominated by Generac Power Systems to represent South Florida on their National Generator Council.  The council was established in order to provide feedback to Generac on manufacturing issues, educate public officials and building departments, and advocate for consumer protection.

     


  • Gas Installations

    Page Under Construction

  • Startups, Warranty Service, Parts

    Page Under Construction

  • System Design & Engineering

    Page Under Construction

  • Generators - Contractor Pricing

    Page Under Construction

  • Directional Boring

    APS Directional Boring Price List

    Effective 10/1/11

     

     

    All utilities need to be marked prior to digging or boring.  If a current line locate ticket isn’t provided for the requested property, APS will call prior to starting work.

     

    APS is not responsible for:

     

    • Cracks to concrete surfaces
    • Vibration damage to interior and exterior personal property
    • Damage to unmarked private utilities along the bore path including other sleeves, irrigation, conduit, sewer laterals, etc.
    • Shifting or settling of interlocking paver surfaces
    • Landscaping of any kind

     

    Pricing excludes:

    • Concrete or asphalt patching
    • New sod
    • Landscape restoration

     

     

    Service

    Price Per Foot (Single Bore)

    Price Per Foot (2nd Sleeve in Same Hole)

    ½” SCH 40 PVC 

    $9

    $5

    ¾” SCH 40 PVC

    $9

    $5

    1”-1 ¼” SCH 40 PVC 

    $10

     

    2” SCH 40 PVC

    $12

     

    2 ½” SCH 40 PVC

    $14

     

    3” SCH 40 PVC 

    $15

     

    Minimum Charge

    $300

     

     

     

     

    Note: Soil conditions, e.g. limestone, coral, other rock materials, may not be conducive to directional boring.             If such conditions are encountered, and APS cannot successfully complete the entire bore path, the minimum charge will apply or the actual completed footage, whichever is greater.

     

  • Prefabricated Slabs

    Prefabricated Concrete Slabs Pricing

    We offer a complete line-up prefabricated and engineered concrete slabs - from 7kW- 150kW.

    APS Generator Pad Pricelist #1

    APS Generator Pad Pricelist #2

    APS Generator Pad Pricelist #3

    APS Generator Pad Pricelist #4

    APS Generator Pad Pricelist #5


Point of Contact:

Cameron Ferguson

Office: 561-886-0470

Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it                                                                                                 


 

Sign up for our Promos & News


Please enter your email address:
  
 

Watch APS in Action!